Abstract:Top-Well’s PULD crew has been conducting more than 2 years of PULD services for Chevron CDB project in Sichuan which is high H2S content gas well development with full client sati
Abstract:Top-Well provides systems for handling and treating oil field produced water, fracturing fluids and other flow back fluids. High concentrations of salts and other contaminants are
Abstract:Wellhead effluent is a common problem in the later stages of oil and gas development. With the energy consumption of the reservoir, the gas flow rate is decreasing and the carrying